Augering

A footing hole is excavated in preparation for the foundation to be built. After the footing holes are excavated, they are reinforced with steel and then concrete is poured into the holes. Once the concrete has cured, crews can begin the construction of the structure itself.

Structure Build

The structures, associated hardware, insulators, and stringing sheaves will be transported to each structure site by truck. The structures will be assembled on the ground and then lifted onto the foundations and secured. Wetland matting is used to minimize impacts to sensitive areas.

PREVIOUS STAGE
NEXT STAGE
Structure Placement