Documents

Document Name Description FileType Date
UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN The intent of this Plan is to assist project sponsors by identifying baseline mitigation measures for minimizing erosion and enhancing revegetation. PDF 1-31-2014
WETLAND AND WATERBODY CONSTRUCTION AND MITIGATION PROCEDURES The intent of these Procedures is to assist project sponsors by identifying baseline mitigation measures for minimizing the extent and duration of project-related disturbance on wetlands and waterbodies. PDF 8-3-2014
TRANSMISSION LINE COMPONENTS Interstate transmission lines consist of a number of components that ensure the efficiency and reliability of a system that delivers such an important energy source year-round... PDF 9-16-2014