UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN |
The intent of this Plan is to assist project sponsors by identifying baseline mitigation measures for minimizing erosion and enhancing revegetation. |
PDF |
1-31-2014 |
WETLAND AND WATERBODY CONSTRUCTION AND MITIGATION PROCEDURES |
The intent of these Procedures is to assist project sponsors by identifying baseline mitigation measures for minimizing the extent and duration of project-related disturbance on wetlands and waterbodies. |
PDF |
8-3-2014 |
TRANSMISSION LINE COMPONENTS |
Interstate transmission lines consist of a number of components that ensure the efficiency and reliability of a system that delivers such an important energy source year-round... |
PDF |
9-16-2014 |